“I want to rule out inaccessible options earlier to focus time on viable options”— National Grid Connections team

Download PDF
Arrow right
Above

Case study overview

National Grid’s Connections teams leverage Sensat’s visualisation platform to support virtual siting studies and option selection for substation upgrades.

National Grid Energy Transmission need to conduct a siting study for a new UK based substation in Navenby, Lincolnshire.

The initial phases of planning for transmission projects involve a thorough and time-consuming process to narrow down potential locations and options. The Connections team want to expedite the elimination of undesirable options and allocate more time and resources towards developing and proposing the preferred options.

Learn how National Grid rule out inaccessible options earlier to focus time on viable options.