Case Study

“I want to rule out inaccessible options earlier to focus time on viable options”

Download PDF
Arrow right
Above

Case study overview

Connections teams leverage Sensat’s visualisation platform to support virtual siting studies and option selection for substation upgrades.

The energy transmission team need to conduct a siting study for a new UK based substation.

The initial phases of planning for transmission projects involve a thorough and time-consuming process to narrow down potential locations and options. The connections team want to expedite the elimination of undesirable options and allocate more time and resources towards developing and proposing the preferred options.

Learn how teams rule out inaccessible options earlier to focus time on viable options.

Download use case