Energy transmission
UK – Nationwide

How National Grid plans the Great Grid Upgrade from one shared view to spot risk earlier

85% faster
Decision turnaround reduced from 35 days to 5
10 critical assets
Coordination across 6 substations and 4 overhead lines
1 shared view
Unlimited user licenses give National Grid, partners, and suppliers an up to date single source of truth
How National Grid plans the Great Grid Upgrade from one shared view to spot risk earlier
Overview

A portfolio-wide platform for the Great Grid Upgrade

To meet net-zero targets, National Grid’s Strategic Infrastructure (SI) division is delivering the most significant overhaul of the UK’s energy network in generations: The Great Grid Upgrade. Huge projects demand fast information. Scattered data, isolated teams, and manual site visits created delays that put the entire schedule in jeopardy.

To solve this, National Grid deployed Sensat as a portfolio-wide Infrastructure Intelligence Platform. By centralising CAD, BIM, and GIS data into a single, real-world digital environment, teams can move from reactive planning to proactive delivery.

Sensat is currently being used on the North London Reinforcement Project. It manages six substations and four overhead line routes between Hertfordshire and Hackney. The platform helps teams test options faster, de-risk site work, and rethink how critical UK infrastructure is delivered.

https://cdn.prod.website-files.com/65018fb421e4ffb022ec5c50/6abbccf88d5d89bb4b3a4295_national-grid-partners-sensat.mp4
The Problem

The Cost of “Information Lag”

On major transmission projects, designs, surveys, schedules, and site updates are scattered across different tools. This means teams rarely end up working from the same page.

  • Information Silos: Critical data (CAD, BIM, GIS) is often trapped in disjointed tools, leading to an “information lag” where teams work from different versions of the truth.
  • High-Risk Planning: Relying on outdated 2D drawings and static imagery makes it difficult to spot real-world clashes, often resulting in discoveries mid-excavation that cause major delays.
  • Collaboration Barriers: Inefficient site verification and communication require repeated physical travel, increasing costs and health-and-safety exposure for engineering and planning teams.
“Sensat isn’t just a tool… it’s a capability that’s helping us transform how we plan and deliver the future electricity network.”
How National Grid plans the Great Grid Upgrade from one shared view to spot risk earlier
SOLUTION

Every site and route in one browser-based view

Sensat is an Infrastructure Intelligence Platform that provides a browser-based environment where all the data comes together against the real landscape. It's built to be fast, intuitive and easy to use, so it isn't limited to specialists.

Teams combine CAD, BIM and GIS designs with reality capture, then use the 2D top-down view - with high-quality imagery - to walk people through each site and along the overhead line routes.

Options can be tested in context before one is taken forward, so the team can find the most cost- or time-effective approach early. P6 schedules are uploaded and 3D models associated with each stage, so the timeline can be stepped backwards and forwards to explain construction sequences clearly. Since the site exists as an accurate real-world view, site walks, measurements and inductions can be done remotely rather than in person.

How National Grid plans the Great Grid Upgrade from one shared view to spot risk earlier
The results

Better decisions, made earlier

Decisions in days, not weeks
Sensat has accelerated decision turnaround from 35 days down to 5 days (85% reduction).
Risks are caught before they are harmful
Overlaying utilities against consent boundaries surface clashes that would otherwise be discovered mid-dig, when they carry the greatest delay and safety cost.
One source of truth
Unlimited licences mean National Grid, its partners and its suppliers all have access to the same information environment.
Why it matters

Hitting connection dates on programmes of this scale

National Grid is incentivised to accelerate project delivery. Making better decisions earlier is what protects the programme: it reduces rework, surfaces risk sooner, and improves collaboration across engineering, planning and stakeholders.

On programmes of this scale, that's the difference between hitting your connection dates and missing them - as on the North London Reinforcement Project.

Where this approach works best

How National Grid plans the Great Grid Upgrade from one shared view to spot risk earlier